What's new
Warez.Ge

This is a sample guest message. Register a free account today to become a member! Once signed in, you'll be able to participate on this site by adding your own topics and posts, as well as connect with other members through your own private inbox!

Make-to-Order Assembly Management

voska89

Moderator
Staff member
Top Poster Of Month
54d63379673703a35f8692dc1ff1e63d.webp

Free Download Make-to-Order Assembly Management by Rainer Kolisch
English | PDF | 2001 | 259 Pages | ISBN : 3540410988 | 19.3 MB
Purchasing .Fabrication Assembly Distribution Figure 1.1: Multi-Level Manufacturing System for Make-to-Order Products specific resources of a type, i.e., a certain machine or a single worker, the determination of the sequence operations are processed on a ma chine, and the assignment of start and finish times to operations. We will modify this framework to be specifically suited for multi level make-to-order manufacturing systems. We assume that the facil ity design issue is settled, i.e., the location and the layout of the facility as well as the capacity ofthe three main resource types of the company are determined. These resource types are the engineering department, the fabrication department, and the assembly department. The engineering department is concerned with the construction of new products as well as the modification and customization of ex isting products. This entails the generation of engineering documents such as blue prints for manufacturing. The capacity of the engineering department is determined by the the count and qualification of engi neers and by the availability of construction devices such as computer aided design (CAD) systems etc.​

[/b]

Recommend Download Link Hight Speed | Please Say Thanks Keep Topic Live

Uploady
6crk9.7z
Rapidgator
6crk9.7z.html
UploadCloud
6crk9.7z.html
Fikper
6crk9.7z.html
FreeDL
6crk9.7z.html

Links are Interchangeable - Single Extraction
 

Users who are viewing this thread

Back
Top